North Korea’s Yongbyon Nuclear Scientific Research Center: Work Continues on 5 MWe Reactor’s Cooling System

Commercial satellite imagery from July 31 of North Korea’s Yongbyon Nuclear Scientific Research Center indicates ongoing work on the secondary cooling system for the 5 MWe reactor. A low-flow discharge is observed coming from the pre-existing cooling water outfall pipe, indicating the reactor is most likely not operating but that residual heat from earlier reactor operations is being dumped.

Imagery also indicates continued vehicular traffic in and around the 5 MWe reactor and Experimental Light Water Reactor (ELWR), although there are no observable signs the ELWR has started operations. Activity around the Radiochemical Laboratory, where plutonium reprocessing is conducted, remains at low levels. Imagery is of insufficient resolution to confirm whether a small plume is coming from the ventilation building’s ventilation stack.

5 MWe Reactor

Commercial satellite imagery from July 31 indicates that dredging of the Kuryong River continues next to the new pump house associated with 5 MWe reactor’s secondary cooling system, suggesting that modifications may not be complete. (Figure 1) Notably, a discharge is observed coming from the pre-existing cooling water outfall pipe, albeit at a low flow. The low flow rate indicates that the reactor is most likely not operating but that residual heat from earlier reactor operations is being dumped. This development raises questions about the role of the new pump house, which had been thought to potentially serve as a new outfall to minimize the signs of reactor operations.

Figure 1. Dredging continues near the 5 MWe reactor’s new pump house and low flow discharge observed from pre-existing cooling water outflow pipe.

Pleaides © CNES 2018, Distribution Airbus DS. For media options, please contact [email protected].

Given this development, it is unclear if testing of the modified cooling system has been completed. What we had last reported as an apparent subtle mixing/eddy interface of water from the pump house may have been simply the mixing of the dredged channel lagoon’s still water with the Kuryong River’s more turbid flow. It is also possible that, if the North Koreans had been testing the new system, they could be doing some additional modifications, requiring the old outfall to be used again to remove the residual waste heat from past reactor operations.

Dredging also continues on the west bank of the Kuryong River in an area located immediately north of the main river bridge. (Figure 2) The purpose of this activity is still unclear, but the operation seems substantial.

Figure 2. Dredging continues on the west bank of the Kuryong River.

Pleaides © CNES 2018, Distribution Airbus DS. For media options, please contact [email protected].

Work has started to refurbish the earthen dam forming the reservoir across the Kuryong River, which is most likely intended to provide a more consistent water supply for cooling the reactors, despite otherwise low river levels during dry weather periods. What appears to be an oiled or asphalt layer has been placed on the top of the dam, and at least one (possibly two) mobile crane/excavator is now working on the dam. These improvements are likely an attempt to strengthen the dam to protect it from breaching or washout during times of potential severe flooding. (Figure 3)

Figure 3. Improvements are being made to the earthen dam forming the reservoir across the Kuryong River.

Experimental Light Water Reactor (ELWR)

There are no visible signs that the ELWR has begun operations. Vehicles continue to move within and around the ELWR and 5 MWe reactor areas. Additionally, a single-story support building (that was partially razed in early March) located in front of the ELWR’s new engineering office building is being completely dismantled. (Figure 4)

Figure 4. Traffic movement continues between the ELWR and 5 MWe reactor.

Radiochemical Laboratory

Activity at the Radiochemical Laboratory appears to be at low levels. Two trucks are present in the motor pool, which is consistent with what was observed in our previous report. And coal bin levels at the thermal plant are low, which is typical in the summer and when there is no ongoing reprocessing campaign.

A possible greyish plume appears to be coming from the top of the stack serving the ventilation building. Color-infrared imagery shows that this feature is not vines or vegetation growing on the side of the building (vegetation would appear red). However, the imagery resolution is insufficient to confirm the exact nature of this anomaly. (Figure 5 and 6)

Figure 5. Low levels of activity at the Radiochemical Laboratory.

Pleaides © CNES 2018, Distribution Airbus DS. For media options, please contact [email protected].

Figure 6. Possible plume from ventilation building stack.
(Color-infrared imagery indicates the anomaly is not vegetation, but the resolution is insufficient to confirm what this feature is.)

Other Key Production Facilities

No significant activities are observed at the Uranium Enrichment Plant or the Radioisotope Production Facility where infrastructure improvements were recently completed.

 